Welcome to ByteDC

Cambodia's first Tier III data center, committed to excellence and unmatched service quality.

Vision

Vision

To become No. 1 secured infrastructure in Cambodia by 2030

To become No. 1 secured infrastructure in Cambodia by 2030

Mission

Mission

To deliver world-class customer experience through:

To deliver world-class customer experience through:

  • keeping your digital services running smoothly and securely.

  • providing fast support and clear communication when you need help until it’s resolved.

Our Culture

At ByteDC, we believe in fostering a culture of innovation, collaboration, and continuous learning. Our diverse team works together to solve complex challenges and deliver exceptional results.

Open-Minded

Integrity

Commitment

Our Leadership Team

Meet the experts driving our success and innovation.

Bob Lim

Driving ByteDC's vision with over 15 years of industry experience.

Erya Houn Heng

Ensuring operational excellence and customer satisfaction across all services.

Mary Kheng

Overseeing financial strategy and sustainable growth for ByteDC.

Mengly Khoun

Overseeing the Network Operations Center to ensure optimal performance, reliability, and efficiency of our network infrastructure.

Bunneng Chean

Cultivating strategic partnerships to drive data center revenue through channel ecosystems.

Kimheng Mok

Developing and executing strategic marketing plans to drive brand awareness, customer engagement, and business growth.

Sela El

Empowering Growth, Fostering Talent, and Shaping the Future.

Piseth Nov

Architecting robust IT frameworks and optimizing technology operations to ensure secure, seamless, and efficient business performance.

We're Hiring!

Join our dynamic team and grow your career.

Bob Lim

Driving ByteDC's vision with over 15 years of industry experience.

Erya Houn Heng

Ensuring operational excellence and customer satisfaction across all services.

Mary Kheng

Overseeing financial strategy and sustainable growth for ByteDC.

Mengly Khoun

Overseeing the Network Operations Center to ensure optimal performance, reliability, and efficiency of our network infrastructure.

Bunneng Chean

Cultivating strategic partnerships to drive data center revenue through channel ecosystems.

Kimheng Mok

Developing and executing strategic marketing plans to drive brand awareness, customer engagement, and business growth.

Sela El

Empowering Growth, Fostering Talent, and Shaping the Future.

Piseth Nov

Architecting robust IT frameworks and optimizing technology operations to ensure secure, seamless, and efficient business performance.

We're Hiring!

Join our dynamic team and grow your career.

Certifications

ISO-27001

Coming soon

PCI DSS

Coming soon

Uptime Tier III

Certified

Certifications

ISO-27001

Coming soon

PCI DSS

Coming soon

Uptime Tier III

Certified

ByteDC partners with the best platform providers

ByteDC partners with the best platform providers

Our Data Center Facility

Explore our state-of-the-art facilities

Building

  • Land Area: 2,100 m2/ 22,604 ft2

  • Freehold land

  • 6 storeys with roof

  • Built up: 81,040 ft2

  • Data Hall Space: 30,000 ft2 o Floor to Floor: 6m

  • Floor Loading: 12.5 kN/m2

Power

Dual Redundant Design (2N). Dedicated Power transformers are provided for the Critical IT Loads and Facilities Loads

Fire & Critical Protection Systems

  • Fire Detection System

  • Pre-action fire protection system

Critical Loads

The Critical Loads (2N) are powered up by FORM 4 Switchboards with Power Busduct outgoing distribution ( Plug & Play) to the respective floors of the Data Centre.

Hot Swapped Electrical Components & Split Core CT

Hot swapped electrical components and split core CTs are installed in the DB PDU for concurrent maintainability and compliance to Uptime Tier 3 / TIA 942 requirements.

DC Hall

  • Each DC Hall is supported by 2N; FORM 4 Power Distribution Units with high level meters for power monitoring.

  • The layers of fire protection for each hall are as follows:
    1) Fire Addressable Alarm Detectors

    2) Pre-Action sprinklers
    3) Fire Suppression system
    4) Very Early Smoke Detection System ( Aspirating Detectors)

Dual Pump Sets & Pipe Works

Dual pump sets and separate pipe woks for the fuel distribution to the generators with 2nos of 10,000 Litres underground storage tanks and controls.

2 Separate Electrical & UPS Room

Each DC hall will have 2 separate Electrical and UPS room to provide critical power to the computer racks

Cooling

Each DC hall and UPS rooms are powered with DX CRACs.

Power Distribution

Power distribution to each floor or the DC hall is via Power Busduct which offers greater flexibility to meet customer requirements

Generators

The Generators are supported by 2 nos (2N) of FORM 4 synchronisation panel for concurrent maintainability.

Generation Set

The Data Centre is powered by 3 numbers of 2500KVA (N+1 configuration) supported by 2N synchronisation panel and busduct connection.

Ducted FCUs

Ducted FCUs are installed outside the all critical equipment rooms

Backbone Structure Cablings

Backbone Structure Cablings in the MDF/MMR rooms

Pre Action / Wet Sprinkler Risers

Hose Reel & Fire Alarm System

Hose reel and fire alarm system for common co-corridor area.

CRAC Equipment Room

Dedicated CRAC equipment room for the DC hall.

Address:

Land No. 356, Street R-4, Sangkat Srah Chork, Khan Daun Penh, Phnom Penh, Cambodia

Customer Care:

+855 23 437 444 (Landline)

+855 15 437 444 (Smart)

+855 92 437 444 (Cellcard)

Messaging:

Socials:

©

2026

ByteDC Solutions Co., Ltd. All rights reserved.

Address:

Land No. 356, Street R-4, Sangkat Srah Chork, Khan Daun Penh, Phnom Penh, Cambodia

Customer Care:

+855 23 437 444 (Landline)

+855 15 437 444 (Smart)

+855 92 437 444 (Cellcard)

Messaging:

Socials:

©

2026

ByteDC Solutions Co., Ltd. All rights reserved.